Gearyforgemore tools
JobMargin

Sign Writing

Sign Writing Quote Calculator: Price a Sign and Check the Margin

1 Enter what the job costs youhours, materials, travel, overheads

Labour

Rates come from your settings

Materials

Travel

Charged per km

Equipment

Subcontractors

Extras

Tip fees, permits, parking

2 Set the margin you wantthe price updates as you type

What you want to make

price = cost ÷ (1 − margin%)

Pro features available with a licence

JobMargin Pro

Get saved job history, quote PDF, and margin dashboard for $5.

Unlock for $5

Checkout opens in a new tab so the job on screen is not lost. Paying unlocks Pro here automatically — there is nothing to copy or paste.

Enter your licence token

You do not normally need this. Use this if you need to recover access after paying on another device or clearing this browser’s data.

The token is in the email sent when you paid. If you need help, contact support quoting the email you paid with.

Quote this job at

$2,331.15

Fair35.00% margin

A workable margin for most jobs.

  • Labour42%
  • Materials33%
  • Travel4%
  • Equipment12%
  • Overhead9%

What it costs you

Labour$640.00
Materials$503.50
Travel$54.00
Equipment$180.00
Subcontractors$0.00
Extras$0.00
Overhead$137.75
Total cost$1,515.25

What you keep

Profit$815.90
Markup53.85%
Effective hourly rate$161.77
Quote at$2,331.15

In sign writing, materials, design and installation are measured differently. Square metre rates for ACM or vinyl shape material cost; design and install hours shape labour. This calculator adds those costs, print and laminate waste, travel and access equipment, then checks margin before quoting. It shows where per-job guesses leak profit.

Start with square metre materials

Most signs start with a substrate such as ACM or corflute and a vinyl finish. Enter each material as square metres and multiply by its rate per square metre. This keeps material cost tied to sign size rather than a job-level guess.

Allow for print and laminate waste

Printed or cut vinyl rarely uses every square metre perfectly. Offcuts, panel joins and application mistakes create waste. Add a realistic percentage or an extra material quantity for this waste, or the quote quietly loses material margin.

Separate design and install hours

Design time and installation time have different rates and risks. A designer may work at one rate, production at another, and an installer at a third. List each hour against its own rate so a complex install is not priced like a simple one.

Include travel and access equipment

Sign installation often means site work: travel, ladders, scaffold or scissor lifts. Travel may be charged per kilometre. Access equipment may be a hire line or subcontractor cost. Add it before uplift so the price covers working at height safely.

Check margin before quoting

Once materials, labour, travel and equipment are added, apply your desired margin and compare the price to a minimum charge. Then look at the effective hourly rate: profit after non-labour costs divided by total hours. If that hourly number is low, the job may keep you busy without making money.

Common questions

How do I cost a sign writing job?

Start with substrate and vinyl as square-metre quantities, add print and laminate waste, then add design, production and installation hours at their own rates. Include travel and any access equipment before applying margin.

Why price materials per square metre?

Most sign faces and panel work scale by area. Square metre pricing lets you reuse a rate and measure offcuts and waste instead of inventing a lump sum for every job.

Why separate design and install hours?

Design and installation require different skills and often different rates. Keeping them separate shows which part drives cost and helps quote complex designs or difficult installs without guessing.

How do I handle print and laminate waste?

Allow a realistic extra quantity for offcuts, trimming, panel joins and failed application. Waste is a material cost, so it must be added before uplift is applied.

What access equipment should be included?

Include any ladder, scaffold, scissor lift or boom needed to reach the sign safely. Hire cost and delivery are part of job cost; if the client supplies access, remove that line.